下线工艺是线束生成加工的前道工序,下线工艺中剥头的处理是线束产品质量的保证。本文主要介绍线束下线工艺中剥头的技术规范和检查。
1下线剥头的检查
(1)下线剥头的测量部位。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
(2)测量方法。将游标卡尺的深度尺顶齐电子线束绝缘体部,将剥头前端与游标卡尺主尺端部对齐,读取数据比较制造指示书的剥皮长与实测长,并判断是否相符。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
2下线后的电线不允许出现以下不良现象
(1)刀具设定过深造成的线芯被切伤。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
(2)刀具损伤造成的线芯端部被斜切。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
(3)刀具损伤造成的线芯长短不一,一根或几根探出。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
(4)刀具设定深度不够或刀具损伤造成的电线绝缘层端部不整齐。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
(5)刀架或导管偏斜造成的导线绝缘层端部被斜切。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
(6)线芯松散。文章源自线束工程师之家-https://www.suncve.com/technical-specification-and-inspection-of-stripping-head/
(7)刀具设定过深造成线芯被切断
(8)线体损伤。
3剥头长度的计算
剥头长度=ab+be+cd,ab=0.2mm210mm,无特殊规定时,电线剥头长度的公差应符合—0.15mm。剥头长度的计算0.3mm要求。对于特殊类型的端子,为了保证压接出头长度,剥头公差应根据实际情况来制定。测量剥头长度应使用游标卡尺。
4下线长度公差
下线长度公差范围应符合表49的要求。
5特殊线下线要求
1绞距拆开距离
无特殊想定时,双绞线两端绞距拆开的最大距离应小于等于80mm。
2屏蔽线的加工方法
1)屏蔽网屏蔽线的加工方法
将屏蔽线的最外层绝缘皮剥离,然后将内芯电线全部从根部用工具挑出。内芯电线使用专用工具剥头。一般情况下需要压接时,铜网拉脱力依据0.5mm2线径标准。
(2)铝箔屏蔽线的加工方法。首先,将屏蔽线大剥皮剥离,然后将铝箔剪掉,内芯电线使用专用工具剥头。
推荐阅读: